BENCH MARK rate of about 1 in 10-20m is installed after the construction, maintenance, equipment, taking into account the Castle located outside interference can be used to permanently install ever.
BENCH MARK After installing a ratio of about one place but construction on the 10-20m consider serviceability, and installation does not interfere with the equipment to where ever permanently available.