GOT 7 "mad" THE STAGE certification activities of certification service in FIRST.
the authentication with the authentication of us is the random draw. seven minutes in this particular gift sent to the country.
[] authentication method
1. this period: in 2015, october 5 to 6: 00 pm (month), november 11 (a) and 6: 00 pm
* (7 days) before the certificate of authentication, upload the article, that is, pay attention to please
2. authentication method:
GOT 7 Fan is my []. this certification authentication, upload the article,
in the form, and the following are the only recognized certification included.
- title: [certificate]
- picture this: 1) THE FIRST STAGE poster image upload, SNS dictionary: in 2015, september 29, tuesday afternoon, i upload a 6 to see their own SNS to capture an image (the star
g, including the FIRST 2) THE STAGE upload image, in the SNS: ex up tickets,.on your photos, it can be the source or SNS upload image, image capture, a
- text content: Fan 's id / name / id card's date of birth (6 seats YYMMDD
) / mobile phone number
การแปล กรุณารอสักครู่..
